Locating the wall.
Installing shower stall door.
Attach the door handles and any towel bars.
If water is escaping between the door and base track consider attaching a separate drip tray to catch and redirect what.
How to install a shower or tub door measuring and cutting the tracks.
Attach the seal strip to the bottom of the door and cut it to the required length.
How to install a shower door shower door overview.
Place end caps on the tops of the wall channels.
Click enlarge this image to.
The interior door goes in first and then the exterior door is installed from the bottom up.
Drill proper holes into the walls for the side rails.
Locating the bottom track.
Once everything is screwed and snapped into place the roller wheels go on the doors and the doors themselves are lifted into place image 1.
Shower door kits will come with a set of metal tracks that seat the shower door so most of the assembly process involves installing the metal frame.
How to install a frameless shower door.
It was actually kind of a random thing.
Put it in place and tape it down until the side rails are in place image 2.
This will be secured by a metal threshold that fits onto the front lip of the tub two side columns that will be secured into the tile walls and a single cross member to connect the columns on top.
How to install a basic sliding tub shower door.
In this video i show installing a frameless shower door enclosure.
Set the base track.
You install the bottom track on the top edge of the shower base or tub.
The top and bottom tracks supplied by the manufacturer must be cut slightly shorter.
Fill in all the measurements and take it with you to the showroom.
Towel off the wet frame before adding more sealant and allow the sealant to cure completely prior to your next test.
Tap a plastic anchor into the pre drilled holes in the tile image 3.
Cut the base track to length.
Run a bead of silicone on the underside of the threshold piece image 1.
Measure the length of the shower threshold then use a hacksaw to cut the aluminum base.
Our shower doors are customized for your space so having a new one ordered fabricated and delivered could take up to 3 weeks.
However the actual installation of your new shower door can be completed by our professional installers in 2 3 hours.