If you hit a stack vent or chimney interlace the shingles with the flashing to allow water to run down the roof.
Laying roofing felt on a pitched roof.
Nail the roofing in place with short roofing nails spaced 6 inches apart and 1 inch in from the outer edges of the roll roofing.
Defer putting drip edge on angled gable ends until after the felt is laid so the metal.
As you roll it out make sure that it remains flat.
Step by step guide on how to apply bituminous roofing felt to your shed roof.
Fasten drip edge on eaves with galvanized nails and a hammer about 12 inches apart before laying roof felt.
Afterward roll the felt away from you lengthwise along the lower edge about 10 feet 120 in.
Once you ve done this you re done.
The roofing felt should be applied in layers that overlap.
When you reach the peak either bring the ridge edges together with a ridge capping layer or cut regular shingles into 3 tabbed equal pieces and bend them so they fit on the.
Begin at the bottom right or bottom left of the roof.
You can then hide the folded over roofing felt with the use of fascia boards.
You will follow the same process as in step 2 for the last layer.
Continue laying your shingles horizontally up the roof.
This video shows a typical flat roof replacement carried out by argyle roofing based in london uk.
You can use your utility knife to cut a slit in the felt overhang at the very top of the roof and then fold the felt down there and nail securely at regular intervals along the gable.
Roofing felt comes in rolls that feature pre marked lines 2 to 3 inches from the top and bottom edges.
Beginning with the removal of the old roofing felt this.
Apply another layer of adhesive to the top for maximum waterproofing.
Start rolling the first layer of felt out from the bottom of one side of the roof.
As you work the paper can be tacked down in the center so it won t blow away.
Unroll the felt so that the lines are facing upward.
Start at the bottom of the roofline and work up so any water that gets through the roofing material will shed down the tar paper and will not go under it.
Start at the bottom of one side of the roof at the right or left edge.
Cover the edges of the roof with strips of felt before laying out the final layer.