Attach the flashing panel in place at the bottom.
Installing metal roof valley flashing.
Use 1 inch galvanized roofing nails.
Then install a non corrosive metal valley flashing of 24 minimum width lap successive sheets of metal flashing a minimum of 12 inches and seal laps.
Install an underlayment centered in the roof valley.
Step 6 install the flashing.
A batten is a roofing component made of a thin layer of metal plastic or wood and is used as a fixing point for roof tiles and roofing sheets.
Drip edge metal valley flashing dormer chimney and kick out flashing shed water away from the connections between roofs walls chimneys and other building assemblies this collection of 18 articles animations and videos identifies the critical roof flashing areas illustrates durable roof flashing details and shows how to flash roofs.
Make sure that the end of the flashing panel is perfectly in line with the edge of the roof.
Apply an approximately 3 inch.
Lay the flashing down in the roof valley and start at the lower end of the roof.
Make sure to cover the gap at the bottom of the raised ridge.
Place a piece of sheet metal under the shingles to make sure you will not damage the flashing.
Cut the bottom edge and fold it down over the drip edge.
Snipping off the corners of.
Lay the flashing in a way that.
Install the valley battens on the sides of the roof that you want to place the valley flashing.
Others start with a 3 inch wide.
Fold the top of the flashing over the ridge.
Place the flashing on the upper portion or the upper flange of the batten.
Install valley battens on both ends of the roof valley then attach first flashing 3 4 inches over the roof flange and another 3 4 inches over the fascia if any is present.
How to do it determine cuts.
Some roofers cut the shingles parallel to the flashing s center ridge.
Recommended procedures of basic valley flashing installation.